4 New Turf Fields Open at Indian Springs Soccer Complex

It’s official, the four turf fields that were part of the 2018 General Obligation Bond package through the City of Broken Arrow are now completed and ready for play to start! This addition, adds four full sized 11v11 fields (existing fields 37-40). Each of the full size fields can be reconfigured into either two 7v7 or 9v9 fields.
On February 15th, the City of Broken Arrow held a Ribbon Cutting Ceremony on the new fields.
Pictures from the Ribbon Cutting ceremony can be found below along with links to articles about the new fields.